On A Mission
Despite the changeable weather, Barry is cracking on with the jobs with the aim of getting the Lynsey B back in the water by the beginning of April.
This week he strips down the console to refurbish the covers. He also takes off the scuppers and the winch for the pot hauler.
Baz also unveils the number of tubes of Sikaflex he used in the construction of the Lynsey B.
Previous
Refurbishment
Next